In 2023, the information
received under RTI Act from Govt. Departments  ( https://odishasoochana.blogspot.com/2023/12/non-odia-contractors-awarded-huge-work.html ) exposed how a
mega Drinking water project worth  
thousands of crores  of rupees
have been designed to hand over the 
non-Odia Contractors. A total amount of Rs 35,000 crores was simply
handed over to 17 Non-Odia Companies who enjoy patronage of Sri V.K. Pandian,
the then Secretary to former Chief Minister and his close associates   i.e, non-Odia officers in Odisha
bureaucracy.  During that time, we
had   alleged that these mega Projects
handed over to non-Odia Contractors   and
sidelining Odia Contractors was meant to loot state exchequer in name of
providing drinking water to the People of Odisha.    After
BJP Govt. came to power in 2024, we filed complaint before Govt. seeking an
inquiry and special audit into allotment of mega projects to all non-Odia
Contractors.   Despite assurance given by
Govt., no inquiry was conducted so far. 
Out of our curiosity and to understand the status of the project and
action, if any taken by Govt. against Non-Odia Contractors, we filed RTI in the
office of Engineer-in-Chief, RWSS to access this information. The below is the
present status of   the mega  drinking 
water projects.  Though four to
five years passed since sanction of the project and despite extension of
time  is granted, not  a single project  has been completed so far. The lack of
potable drinking water   for rural people
in Odisha has led to widespread outbreak of Diarrhoea  in  different
districts. We put  this information in
public domain with the objective generating public opinion and putting pressure
on Govt. to refrain from sanctioning any kind of project to non-Odia
Contractors. 
| Sl.No.  | Name  of District  | Name  of agency  | Name of the project  | Total amount sanctioned  with
  year  | Total amount utilized  | Status of the project  | Remarks  | 
| 1 | Puri  | M/s Indian Hume Pipe Co.
  Ltd., Mumbai  | Mega Piped Water Supply to
  68 villages of Astarang Block, 64 villages of Kakatpur block, 52 villages of
  Gop Block of Puri district  | Rs. 192.46 crore  in 2023 | NA  | On-going  |  | 
| 2 | Puri  | M/s Indian Hume Pipe Co.
  Ltd. , Mumbai | Mega Drinking Water Project
  for supply of drinking water to 68 villages under Puri Sadar  and 78 villages of Gop block  | Rs. 213.98 crore  | NA  | On going  |  | 
| 3 | Puri  | M/s Indian Hume Pipe Co.
  Ltd. , Mumbai | Mega  Drinking Water Project  for water supply to 78 villages  of Delang Block  | Rs. 107.42 Crore  | NA  | On4 going  |  | 
| 4 | Puri | M/s GVPR Engineer’s Co
  Ltd.  Hyderabad  | Mega  Drinking Water Project  for water supply to 126 villages of Kanas
  Block, 18 villages of Brahmagiri Block , 14 villages of Satyabadi Block  | Rs. 184.12 Crore  | NA  | Ongoing  |  | 
| 5 |  Khorda  | JMC-Jindal water
  Infrastructure Ltd.  Joint Venture  | Piped Water Project to 337
  villages of Bolagada and Begunia  Block
  of Khorda district ( Location- Sananayapali, patapursasan Gp, Bolagarh )  | Rs. 326.08 Crore  | NA  | On going  |  | 
| 6 | Khorda  | Krishan  S, Mumbai and UMSL  Ltd, Odisha  | Mega PWS to Ranipada Cluster
  of Banpur block  | Rs. 67.57 Crore  | NA  | Ongoing  |  | 
| 7 | Khorda  | L &T Company  | Mega PWS  to Chilika, Tangi and Banpur blocks  | Rs. 188.76 Crore  | NA | Ongoing  |  | 
| 8 |  Khorda |  L and T Company  | Mega PWS to Begunia and
  jatni Block  | Rs. 278.06 Crore  | NA | Ongoing  |  | 
| 9 | Khorda  | NCC Company  | Mega PWS to  Balipatna Block  | Rs. 142.73 Crore  | NA | Ongoing  |  | 
| 10 |  Khorda  | NCC  Company  | Mega PWS to 16 GPs of
  Balianta Block  | Rs. 128.62 Crore  | NA | Ongoing  |  | 
| 11 | Khorda  | NCC Company  | Mega PWS to 9 GPs of
  Bhubaneswar Block  | Rs. 82.61 Crore  | NA | Ongoing  |  | 
| 12 | Khorda  | NCC Company  | Mega PWS to 6 GPs of
  Bhubaneswar Block  | Rs. 46.72 Crore  | NA | Ongoing  |  | 
| 13 | Khorda  | NCC Company  | Mega PWS to 17 GPs of Tangi
  Block | Rs. 133.58 Crore  | NA | Ongoing  |  | 
| 14 | Jajpur | Megha Engineering and
  Infrastructure Limited , Hyderabad  | Mega PWS  to Dasarathpur Block  | Rs. 181.78 Crore ,
  sanctioned in 2018-19 | Es. 158.95 crore  | On going  | Project  was about to be completed by 30.12.2021 .
  But EOT applied upto 30.12.24. Still Project is not  completed.  | 
| 15 | Jajpur  | Megha Engineering and
  Infrastructure Limited, Hyderabad  | Mega PWS to Badachana Block  | Rs.335.72 Crore sanctioned
  in 2018-19 | Rs. 287.32 crore  | On-going  | Project  was about to be completed by 30.12.2021 .
  But EOT applied upto 30.12.24. Still Project is not  completed. | 
| 16 | Jajpur  | Megha Engineering and
  Infrastructure Limited, Hyderabad | Mega PWS to Dharmashala
  Block  | Project  was about to be completed by 30.12.2021 .
  But EOT applied upto 30.12.24. Still Project is not  completed. | |||
| 17 | Jajpur  | Megha Engineering and
  Infrastructure Limited, Hyderabad | Mega PWS to Jajpur and
  Binjharpur Block  | Rs.245.98 crore , sanctioned
  in 2020-21 | Rs.189.18 crore  | On-going  | Project  was about to be completed by 22.3.24  . But EOT applied upto 24.3.25 Still
  Project is not  completed. | 
| 18 | Jajpur | KEC and BRCC  | Mega PWS  to Danagadi block  | RS. 87.11 Crore  | Rs. 67.35 crore  | On going  | Project to be completed by
  9.3.21  but EOT approved 23.2.25 . but
  not completed  | 
| 19 | Jajpur | KEC International Ltd joint
  venture with  BRCC | Mega Drinking Water Project
  for Dharmashala and Rasulpur block | Es.167.16 crore  | Rs. 115.77 crore  | On going  | Project to be completed by
  9.3.21 . EOT Approved till 23.2.25. but not completed  | 
| 20 | Jajpur | KPIL  | Mega PWS to 258 villages
  under Korei block  | Rs.127.06 crore  | Rs. 32.79  crore  | On going  | The project is about to be
  completed by 24.3.25 . but continuing.  | 
| 21 | Jajpur | KPIL Company  | Mega Drinking Water Project
  for 89 villages under Bari block  | Rs. 127.60 crore  Sanctioned on 2022-23  | Ongoing  | ||
| 22 | Jajpur | NCC Limited  | Mega Drinking Water Project
  for 52 mining affected villages of 16 GPs of Sukinda block  | Rs. 107 crore sanctioned in
  2018-19 | Rs. 101.09 crore  | Ongoing  | Project was sanctioned on
  27.11.21 and extended upto 31.5.24 . but not yet completed  | 
| 23 | Jajpur  | NCC Limited  | Mega Drinking Water Project
  for 33 no of mining affected villages of Sukinda block  | Rs. 79.56 crore  sanctioned in 2017-18  | Rs. 67.03  crore  | Ongoing  | Project was about to
  complete on 30.9.21 but not yet completed  | 
| 24 | Jajpur  | NCC Limited  |  Mega Drinking Water Project for 15 no. of
  mining affected villages of Sukinda block  | Rs. 46.19 crore sanctioned
  in 2018-19  | Rs. 43.99 crore  | Ongoing  | Project was about to
  complete on 30.11.2022  but not yet
  completed  | 
| 25 | Rayagada  | M/S KEC Limited and  SPML Joint Venture  | Mega Drinking Water Project
  for 24 GP, 418 Villages and 4 GPs, 49 villages  of Rayagada Block  | Rs. 298.70 crore  | Rs. 152.20 crore  | On-going  | No action taken  | 
| 26 | Rayagada  | M/s Zuberi Engineering
  Private Limited  | 14 GPs of Gunupur Block  | Rs. 79.40 Crore  | Rs. 58.40 Crore  | On-going  | No Action Taken  against the Company  | 
| 27 | Rayagada  | M/S SIIPL and SIEPL Joint
  Venture  | 3 no. Individual RPWS
  Project  pertaining to Ramanaguda and
  Kolanara Block  | Rs. 114.68 Crore  | Rs. 35.58 Crore  | On-going  | No action taken against  the Company.  | 
| 28 | Rayagada  | M/s Zuberi Engineering
  Private Limited | Execution of Mega PWS
  Project to 18 GPs of Bisamcuttack Block  | Rs. 84.23 Crore  | Rs. 63.37 Crore  | On-going  | No action taken by the
  Company  | 
| 29 | Cuttack | M/s Megha Engineering
  Infrastructure Ltd.  | Mega PWS Project for 37 GPof
  Mahanga Block and 7 GP of Nischnktakoili Block  | Rs. 194.92 Crore  | Rs. 165.95 Crore  | On-going  | Partially functional  | 
| 30 | Cuttack |  Blue Star , SPML Infra JV Limited  | Mega PWS Project  for 72 villages of Nischntakoili Block  | Rs. 62.16 Crore  | Rs. 26.67 Crore  | Ongoing  | Non-Functional  | 
| 31 | Cuttack  | Blue Star VISHWA Infra JV
  Ltd.  | Executing of Mega PWS
  Project pertaining to 13 GPs of Banki Block, 17 GPs of Damapada Block, 2 GPs
  of Baranga Block  | Rs. 189.69 Crore  | Rs. 68.64 Crore  | Ongoing  | No-functional  | 
| 32 | Cuttack  | M/S Dineshchandra R. Agrawal
  Infracon Pvt. Ltd.  JV with M/s Bhugan
  Infracon Pvt. Ltd.  | Execution of PWS Project for
  149 villages of Tangi Choudwar Block  | Rs. 153.51 Crore  | Rs. 27.16 Crore  | Ongoing  | Non-functional  | 
| 33 | Gajapati  | JMC – SPML Joint Venture  | Mega PWS Project for 39 GP
  of Mohana Block from Harabhanga Reservoir  | Rs. 622.13 Crore  | Rs.198.57 Crore  | Ongoing  |  | 
| 34 | Gajapati  | Mega PWS Project for 19 GPs
  of Nuagada Block, 17 GPs of R. Udayagiri Block |  |  | |||
| 35 | Gajapati  | 5 GPs of Gumma Block  | Rs.30.33 Crore  |  | Ongoing  |  | |
| 36 | Gajapati  | Megha Engineering and
  Infrastructure Limited  | Mega PWS project for 190
  villages of Rayagada Block  | Rs. 379.17 Crore  | Rs. 47.88 Crore  | ongoing |  | 
| 37 | Boudh  | Land T Company Ltd.  | Mega PWS Project for Boudh
  Block  | Rs.205.48 Crore  | Rs. 194.89 Crore  | Ongoing  |  | 
| 38 | Boudh  | Land T Company Limited  | Mega PWS Project for
  Kantamala Block  | Rs. 214.93 Crore  | Rs.202. 22 Crore  | Ongoing  |  | 
| 39 | Boudh  | Land T Company Limited  | Mega PWS Project  for Harabhanga Block  | Rs. 195.70 Crore  | Rs. 134.47 Crore  | Ongoing  |  | 
| 40 | Nawarangpur  | JMC-JWIL Company  | Mega PWS project for 72 GPs
  of Nandahandi and Tentulukhunti Block  | Rs. 149.39Crore sanctioned
  on 9.8.2019  | Rs.139.20 Crore  | Ongoing  | Date  of the 
  completion was 8.8.21. EOT was granted upto 31.12.24. Still Project
  could not be completed . Penalty amounting 0.05 % of Project Cost per day was
  imposed  on 2.3.2024 onwards  | 
| 41 | Nawarangpur  | JMC-JWIL Company | Mega PWS project for 11 GPs
  of Kosagumuda Block  | Rs. 99.01 Crore  sanctioned on 9.8.2019  | Rs. 101.63 Crore  | Ongoing  | Date  of the 
  completion was 8.8.21. EOT was granted upto 31.12.24. Still Project
  could not be completed . Penalty amounting 0.05 % of Project Cost per day was
  imposed on 2.3.2024 onwards  | 
| 42 | Nawarangpur | M/s GVPR Engineering Pvt.
  Ltd  | Two no. Individual Mega PWS
  Project for Nawarangpur, Papadahandi and Kosagumuda Block  | Rs. 403.94 Crore sanctioned
  on 1.3.2019  | Rs. 368.41 Crore  | Ongoing  | The Project was about to
  complete 30.7.21 . But EOT was extended to 31.12.2025 . penalty amounting
  0.03 % on balance work for delay in project 
  imposed on 5.11.24  | 
| 43 | Nawarangpur  | M/s GVPR Engineering Pvt.
  Ltd | Two no. Individual Mega PWS
  Project for Chandahandi Block  | Rs. 139.48 Crore  sanctioned on 1.3.2019  | Rs.118.73 Crore  | Ongoing  | |
| 44 | Nawarangpur  | M/s L and T Company Ltd  | 66 villages of Dabugaon
  Block and 68 villages of Jharigaon Block  | Rs. 261.27 Crore  | Rs.39.04 Crore  | Ongoing  |  The project started on 294.23 and date fixed
  for Completion 29.3.25. But 10% of work has not been completed  | 
| 45 | Keonjhar  | M/s NCC Ltd, Hyderabad  | 19 villages under Hatadihi
  Block  | Rs.35.87 Crore  | Rs. 36.15 Crore  | Completed and operational  |  | 
| 46 | Keonjhar  | M/s NCC Ltd, Hyderabad | 200 villages under Hatadihi
  Block  | Rs. 281.87 Crore  | Rs. 290.08 Crore  | Ongoing  | Though more amount released
  than sanctioned amount , the project could not be completed.  | 
| 47 | Keonjhar  | M/s Megha Engineering
  Infrastructure Pvt. Ltd.  | Mega PWS for 138 no.
  villages under Saharapada Block  | Rs.182.32 Crore  | Rs. 186.18 Crore  | Ongoing  | Govt. has penalized /
  liquidated damage to the tune of 1% on the balance value of work on the
  executing agency on 28.2.24 | 
| 48 | Keonjhar  | M/s Megha Engineering
  Infrastructure Pvt. Ltd. | Mega PWS to 81 no. villages
  under Anandpur Block  | Rs.112.37 Crore  | Rs. 114.62 Crore  | Ongoing  | Govt. has penalized /
  liquidated damage to the tune of 1% on the balance value of work on the
  executing agency on 28.2.24 | 
| 49 | Keonjhar  | M/s Megha Engineering
  Infrastructure Pvt. Ltd. | Mega PWS to 200 no.
  villages  under Ghasipura and Anandpur  | Rs. 155.44 Crore  | Rs. 151.12 Crore  | Ongoing  | Govt. has penalized /
  liquidated damage to the tune of 1% on the balance value of work on the
  executing agency on 28.2.24 | 
| 50 | Keonjhar  | M/S Land T limited  | Mega PWS  for 144 
  villages  of telkoi, Ghatagaon
  and Patna and HarichndanPur Block  | Rs. 1176.50 sanctioned in
  2019  | Rs. 355 .53 Crore  | Ongoing  | The Govt. Has imposed
  penalty  amounting Rs.1,18,17, 568.00
  on 8.10.2024  | 
| 51 | Sundargarh  | Kalpataru Pvt. Ltd ( JMC)  | Mega PWS  for Bisra, Lathikata, Lahunipada  and Bonai block  | Rs.388.81 Crore  | Rs. 215.44  Crore  | Ongoing  | 60% work completed . Govt.
  has imposed penalty Rs. 26,35,660.00 | 
| 52 | Sundargarh  | Universal MEP Project and
  Engineering services ( VOLTAS)  | Mega PWS to Gurundia and
  Lathikata Block  | Rs. 152.00 crore  | Rs. 121.74 crore  | Ongoing  | An amount of
  27,45,118.00  as penalty imposed .
  External electrification not completed.  | 
| 53 | Sundaragarh  | Universal MEP Project and
  Engineering services ( VOLTAS) | Mega PWS for Koida and
  Lahunipada Block  | Rs.168.11 Crore  | Rs. 121.74 crore  | Ongoing  | A penalty amounting Rs. 30,
  47,485 imposed  water supply is under
  testing  | 
| 54 | Sundaragarh  | Universal MEP Project and
  Engineering services ( VOLTAS) | Mega PWS for Kuanrmunda,
  Nuagaon Block  | Rs. 340.39 Crore  | Rs.282,09 Crore  | Ongoing  | Rs. 19,31,910 penalty
  imposed  | 
Prepared
by Pradip Pradhan , M-9937843482 
Date-
25.6.25 
 
No comments: