Bureaucrats use Public Money
on their Whims and Fancies
At  a
stretch OSDMA   released Rs.2.5 Crore to IIT, Bombay for land
slide Study without    signing
any MOU or accepting any  detailed  Proposal – AN RTI Revelation
Dear friends 
On dated 11.3.20., RTI Application was submitted to the
PIO , office  of OSDMA ( Odisha State
Disaster Management Authority), Bhubaneswar seeking  the 
following  information. 
i.  Copy 
of  all correspondence  made 
with IIT, Bombay while  assigning  study 
on Landslides in Gajapati  in pre
and post-assignment  period. 
ii. Copy  of 
the  file  noting 
with  regard  to 
decision taken  for  assigning IIT, Bombay  the 
said study 
iii.
Provide copy  of  decision taken / Order  including 
file  noting   for release 
of advance amount  Rs. 2.5
crore   with date  of release. 
iv. Copy  of 
Review, if any  made  at OSDMA 
level  about  progress 
or  completion  of 
the  study  during 
period  of  present MD, OSDMA
On 19.5.20, the PIO 
supplied  the  information 
which  are  as follows. 
1.      
From the 
file  noting , it  was 
found that the Chief Minister, during his visit  to the cyclone Titli affected area  in October 2018 had expressed  his deep 
concern for landslide event  in
Gajapati  district. He had  declared that 
vulnerability mapping  of hilltop
villages would be done  and shelter  houses 
to be provided  to the  community , wherever required. 
2.      
The State Executive  Committee ( SEC) headed by the Chief
Secretary, in its 3rd meeting for 2018-19 held  on 22.10.18 
approved  the landslide
vulnerability mapping by OSDMA  for  which necessary fund would be provided from
SDRF ( State  Disaster Response Fund). 
3.       Without inviting
any tender or Expression of Interest, Shri Bishnupada Sethy,  the then Managing Director, OSDMA  assigned Indian Institute of Technology,  Bombay ( Rs. 2.5 crore project) for the
landslide vulnerability study  for
Gajapati District. OSDMA has   maintained utmost
secrecy  and has not  disclosed any information  about 
details of  procedure  followed and decision taken   and preliminary correspondence made  between OSDMA and IIT, Bombay  for arriving at  decision to 
assign this study ( for example letter dt. 30.3.2019) , as it  was  sought 
for  under RTI Act. The reason for
not  inviting Expression of Interest
through advertisement  and  hurriedly selecting IIT, Bombay  for 
this study is best known to OSDMA officials. 
4.      
But it 
was observed  from the file
noting  that the Team of IIT, Bombay  visited three worst landslides affected
areas  in the Gajapati  district 
and  submitted a preliminary
report  to OSDMA  which was 
placed before 4th SEC meeting 
for the year 2018-19 held on 5.2.2019. 
5.      
Following 
their  preliminary report,  OSDMA assigned  this 
study  to IIT, Bombay  without 
signing any MOU and devising timeline 
and  released   total Rs. 2.5  crore 
at  stretch  on 25.4.19 without approval of the Finance
Department.
6.      
In respect of sanctioning of Rs. 2.5
crore  to IIT, Bombay by Sri Bishnupada Sethy,
MD, OSDMA, it has been  clarified  by Bholanath Mishra, General Manager (
Geotechnology), OSDMA which is observed from the  file noting 
that the Governing Body in its 3rd meeting has delegated the
sanctioning power upto Rs. 5.00 core to the Managing Director for any scheme. I
suggest that this issue  must  be looked 
into by the state Govt.  from the
perspective of effective  management of
SDRF fund  through approval of Finance
Dept. 
7.      
It 
deserves to mention here that IIT, Bombay had not submitted any proposal  for  the Study 
on  “Vulnerability Mapping of
Landslide Prone areas under Cyclonic storm 
in the Gajapati district”
8.      
It
is  also learnt from the text  of the letter 
written by IIT, Bombay  on
2.4.19  that  “ the duration of the project was one
year  and the consultation charges was be
Rs. 2,11,86,441.00 with 18%GST ( total Rs. 2.5 crore) . 
9.      
After  four
months of  release  of  Rs.
2.5 crore  ,  the  Study Team of IIT, Bombay made  their 
first visit  to Gajapati
district  on 2nd and 3rd
September, 2019 for the said study.  
10.  
On 30.10.19., OSDMA  wrote a letter to Prof. Manas Ranjan Behera, Associate
 Professor , IIT,  Mumbai, Team Leader  to send a team of experts  to the recent landslide sites  occurred 
in Gumma and Rayagada  block of
Gajapati district and submit  the report.
  IIT
Team visited Gajapati on 12.11.19 
11.  
From the proceedings of the meeting of OSDMA
held on 13.11.19, it was found that Mr. Pradeep Jena, present Managing Director, OSDMA really blew
the whistle. This meeting was called by him to review the progress
of ongoing  landslide study  undertaken by IIT, Bombay. It  was  directed
 by 
Sri Jena that –
a.      
IIT, Bombay 
would modify the methodology and 
come  up with detailed  proposal ( IIT, Bombay  had 
not  submitted  any 
proposal . But Mr.  Bishnu Pada
Sethy, the then MD sanctioned full amount of Rs. 2.5 crore as advance. It never
happened anywhere in Govt. sector) , devise  a timeline for execution  & 
completion of the work. The modified proposal would be submitted within
three weeks. 
b.     
IIT, Bombay would submit the exhaustive proposal
with timeline of completion by 13th December,2019  and submit UC of the expenditure incurred
under this project to settle the advance amount released to IIT, Bombay. 
c.      
As MOU 
was  not  signed 
on 25.4.19 at the  time of
release  of entire project money, MOU  will 
be signed now after  review of
progress  and revised plan. 
12.   One
year is over. So far, IIT, Bombay has neither submitted any report nor UC. 
13.   Study
is going on. Nobody knows when the study will be completed. 
14.   It
is desired to conduct an inquiry into nexus of Sri Bishnupada Sethy and IIT, Bombay,
how a project was sanctioned without 
floating any tender and inviting Expression of Interest and total amount
was released without signing any MOU and underlining check and balance. 
Pradip Pradhan
M-9937843482
Date- 22.5.20
 